Monthly Archives for February 2019

Bioclimatic & Passive House at Bescanó

Bioclimatic & Passive House at Bescanó

Site: Bescanó, Girona. Client: Arquima Constructed area: 273 m². Heating demand: 27.52 Kwh/m²/any. Cooling demand: 13.18 Kwh/m²/any. Energy rating: A 48.15 Kwh/m²/any. (Passive house) Construction company: Arquima The house has A Energy Rating and is designed with PassivHaus criteria. This house has been conceived through a careful study of its volume and optimization of its […]

Leer más...

Bioclimatic & Passive House at Gavà

Bioclimatic & Passive House at Gavà

Site: Barcelona. Client: Arquima Built surface: 227 m². Heating energy demand: 6.66 Kwh/m²/año. Cooling energy demand: 10.43 Kwh/m²/año. Energy rating: A 23.71 Kwh/m²/año. (Casa pasiva) Constructor: Arquima The house has an A energy rating and is designed with PassivHaus criteria. This home has been conceived through a  study of its volume and the optimization of […]

Leer más...

Apartment refurbishment at Rubí

Apartment refurbishment at Rubí

Site: Rubí, Barcelona. Client: Private Built surface: 60 sqm. Heating energy demand : 7 Kwh/sqm/year. Cooling energy demand : 10 Kwh/sqm/year. Energy rating: A 4A+A Arquitectura Ambiental February 2019.    

Leer más...

nZEB Energy consulting for 2 single family houses in Barcelona

nZEB Energy consulting for 2 single family houses in Barcelona

  The commission consists to assess a series of improvement proposals in order to reduce the energy demand in a 2 single family houses in Barcelona Architect: Ana Martínez Rodríguez 4A+A Arquitectura Ambiental, 2019

Leer más...