Passive house at Vallirana (construction phase)

Construction site: Vallirana, Barcelona.
Client: Arquima
Construction surface: 156 m².
Heating demand: 8.32 Kwh/m²/any.
Refrigeration demand: 11.49 Kwh/m²/any.
Energy ratingA 36.89 Kwh/m²/any. (Passive house)
Construction company: Arquima

facana taller

House with A energy rating designed with Passivhaus criteria.

The façades are built in the assembly factory.

4A+A Arquitectura Ambiental June 2018.