Construction site: Vallirana, Barcelona.
Client: Arquima
Construction surface: 156 m².
Heating demand: 8.32 Kwh/m²/any.
Refrigeration demand: 11.49 Kwh/m²/any.
Energy rating: A 36.89 Kwh/m²/any. (Passive house)
Construction company: Arquima
House with A energy rating designed with Passivhaus criteria.
The façades are built in the assembly factory.
4A+A Arquitectura Ambiental June 2018.